 |
 |
|
 |
| |
¡¡¡¡Add£ºYancheng funing Detong ¡¡¡¡¡¡¡¡¡¡Petrochemical Machinery ¡¡¡¡¡¡¡¡¡¡Manufacturing Co.,ltd.
¡¡¡¡Tel£º0515-87295358
¡¡¡¡Phone£º13805117191
¡¡¡¡Fax£º0515-87295358
¡¡¡¡Zip£º224400
¡¡¡¡http://www.js-detong.com
¡¡¡¡E-mail:
¡¡¡¡detong@js-detong.com |
|
|
 |
|
 |
 |
| |
| |
| ¡¡The killing of expenditure > The killing of expenditure |
| |
|
|
Pry load Killing of the wings
|
WD expenditure of vertical
|
|
|
UP&down and landing of fixed-under-balanced expenditure
|
up&down Killing of the wings
|
|
| |
Description: |
¡¡¡¡¡¤The first casing, the casing Stone casing Hanger linked to sit straight for the hole seat structure, linked to sit shoulder to 45-degree cone, has better load-bearing capacity.
¡¡¡¡¡¤According to the need to be casing the first structure designed as a whole or separated structure or separated structure.
¡¡¡¡¡¤ Casing head and the surface casing of connections can be as follows: welding, thread kava style.
¡¡¡¡¡¤ Casing for use with the hoisting of the structure forms: slip and thread (Mandrel ).
¡¡¡¡¡¤ The export side of the connection are: thread, flange-style silk plant, the flange-style.
¡¡¡¡¡¤ The first casing, the casing Stone at the bottom of a sealed casing secondary institutions and mouth sealed test. |
| Product specifications£º |
¡¡Work pressure |
¡¡2000¡«15000psl |
Product specification level |
psl3¡«psl4 |
Nominal Path |
¡¡2 1£¯16¡å¡«4 116¡å |
Implementation of standards |
APL SPEC 16C&APL SPEC 6A |
|
¡¡EE&FF |
|
|
|
|
|
|
| |
|
|